Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-paginate domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/foresight-platform/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the the-events-calendar domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/foresight-platform/wp-includes/functions.php on line 6121
EFP Brief No. 123: Scenarios 2026 for the South West of England – European Foresight Platform

EFP Brief No. 123: Scenarios 2026 for the South West of England

This study (which took place in 2004) presents four ‘socio-economic-political scenarios’ designed to stimulate, guide and inform strategic thinking about the future of one of nine English regions, namely the South West. The scenarios portray distinct pictures of the social, political and economic background against which the strategies for the South West can be reviewed and developed. They provide a consistent approach and serve as practical thinking tools. The scenarios are also intended to help organisations in the South West to assess their vulnerability to forces of change and to plan appropriate adaptation strategies.

EFMN Brief No. 123_South_West_England